Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2 ADA and prowag compliant concrete curb ramps; 7,300+ SYS of mill 1 1/2" & overlay 1 1/2" of asphalt pavement, pavement markings, and erosion control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project is partially funded with community crossing grant funds (CCMG) and consists of constructing; two ADA and prowag compliant concrete curb ramps; 5,660+ SY of asphalt milling 1 1/2" deep and overlaying with 1 1/2" of HMA surface, pavement patching, wedge & leveling, pavement markings and site restoration.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
Project is partially funded with community crossing grant funds (CCMG) and consists of constructing; two ADA and prowag compliant concrete curb ramps; 5,660+ SY of asphalt milling 1 1/2" deep and overlaying with 1 1/2" of HMA surface, pavement patching, wedge & leveling, pavement markings and site restoration.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Knox Board of Public Works and Safety is soliciting sealed bids for the 2026 Call #1 CCMG Pavement Improvements Project, consisting of a 2-inch mill and fill on designated streets. Bids are due by 9:00 AM CST on January 28, 2026, and must include the required bid bond and non-collusion affidavit, with performance and payment bonds at 100% of the contract price upon award. Specifications and plans are available upon request at the Clerk‑Treasurer’s office.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
The City of Knox Board of Public Works and Safety is soliciting sealed bids for the 2026 Call #1 CCMG Pavement Improvements Project, consisting of a 2-inch mill and fill on designated streets. Bids are due by 9:00 AM CST on January 28, 2026, and must include the required bid bond and non-collusion affidavit, with performance and payment bonds at 100% of the contract price upon award. Specifications and plans are available upon request at the Clerk‑Treasurer’s office.
AvailableThe Town of Lynn seeks bids for its 2026 Community Crossings Matching Grant (CCMG) project consisting of site work and paving on various local streets. The scope is typical CCMG mill‑and‑fill/resurfacing with associated incidental work within Lynn, Indiana. Bids are due January 13, 2026 for this single, construction‑focused solicitation (not a grant program).
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
The Town of Lynn seeks bids for its 2026 Community Crossings Matching Grant (CCMG) project consisting of site work and paving on various local streets. The scope is typical CCMG mill‑and‑fill/resurfacing with associated incidental work within Lynn, Indiana. Bids are due January 13, 2026 for this single, construction‑focused solicitation (not a grant program).
AvailableThe project includes installation of a PFAS filter system and Iron & Manganese filter system at an existing well site (Wyntree) and installation of a pipeline interconnecting two existing water systems (Willow Hill).
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
The project includes installation of a PFAS filter system and Iron & Manganese filter system at an existing well site (Wyntree) and installation of a pipeline interconnecting two existing water systems (Willow Hill).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →