Summary
work includes 1 LS of Boardwalk; 1 LS of Piers; 1 LS of Accessible Dock; 1 ls of Boat Ramp End Section; 27 EA of Benches - with right, left, and center arm with plaque tray; 26 EA of Bike Rack; 1 EA of Bike Repair Station; 2 EA of Repaint Existing Shelters; 1 LS of Shelter Security lighting; 1 LS of Electrical Service to Playground scoreboard; 1 LS of Wayfinding Signage; 464 LF of Railing and gate for boardwalk; 1,144 CY of Topsoil, On-site; 1,936 CY of Topsoil, Off-site; 5,561 CY of Excavation, Class 10; 1 LS of Excavation, Class 10, Temporary; 31 LF of Removal of Known Pipe Culvert, CMP, 12"; 5 CY of Replacement of Unsuitable Backfill Material; etc, see outside link.