Summary
The Project includes the following Work: Furnishing all labor, equipment, and materials necessary for removal and replacement of 7 existing sewer manholes and construction of 1 new manhole; approximately 100 LF of 8 gravity sewer point repairs; replacement of approximately 23 existing sanitary sewer services; CIPP lining of approximately 12,150 LF of existing 8-12 gravity sewer; rehabilitating approximately 70 manholes, including lining, new frame & covers, rebuilding bench & flow channels, etc.; cleaning and televising of approximately 1,200 LF of uninspected sewer pipe; along with related fittings, roadway/pavement repair, and associated restoration work.