Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Crescent City
The Project includes the following Work: Base Bid limits that generally include 100 LF of 6" PVC water main and 1,100 LF of 8" PVC water main installed via conventional and trenchless means, with associated water services, fire hydrants, valves, restoration, etc., with electrical system improvements to the Pump Station, including installation of 45 kW natural gas generator. Additive Alternate 1 extends the 8" water main work by an additional 1,600 LF. Additive Alternate 2 includes additional water services.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Baudette
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
City of Baudette
Close: Dec 4, 2025
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
AvailableCity of Golconda
Replacement of the existing pump station with a new duplex submersible pump lift station, pre-cast concrete wet well, valve vault, & manholes, electrical controls and service, 8" and 10" PVC sanitary sewer connections to the new lift station and 6" PVC force main piping, connections and other appurtenant work. Cleaning & video inspection of approx. 470 LF of 8" and 880 LF of 10" sanitary sewer, sewer rehabilitation that may include 8" & 10" CIPP, lateral reinstatement, point repairs, manhole lining, and other appurtenant work.
Posted Date
-
Due Date
Dec 9, 2025
City of Golconda
Close: Dec 9, 2025
Replacement of the existing pump station with a new duplex submersible pump lift station, pre-cast concrete wet well, valve vault, & manholes, electrical controls and service, 8" and 10" PVC sanitary sewer connections to the new lift station and 6" PVC force main piping, connections and other appurtenant work. Cleaning & video inspection of approx. 470 LF of 8" and 880 LF of 10" sanitary sewer, sewer rehabilitation that may include 8" & 10" CIPP, lateral reinstatement, point repairs, manhole lining, and other appurtenant work.
AvailableCity of Yamhill
The City of Yamhill, Oregon invites sealed bids for the North Olive Street Water Main Replacement, including furnishing and installing approximately 850 feet of 8‑inch ductile iron water main and associated appurtenances along North Olive Street. Bids are due December 3, 2025 at 2:00 PM Pacific; bid documents are provided electronically at no cost by AKS Engineering & Forestry.
Posted Date
Nov 19, 2025
Due Date
Dec 3, 2025
Release: Nov 19, 2025
City of Yamhill
Close: Dec 3, 2025
The City of Yamhill, Oregon invites sealed bids for the North Olive Street Water Main Replacement, including furnishing and installing approximately 850 feet of 8‑inch ductile iron water main and associated appurtenances along North Olive Street. Bids are due December 3, 2025 at 2:00 PM Pacific; bid documents are provided electronically at no cost by AKS Engineering & Forestry.
AvailableBorough of Denver
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Borough of Denver
Close: Dec 15, 2025
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis