City of Yamhill
The City of Yamhill, Oregon invites sealed bids for the North Olive Street Water Main Replacement, including furnishing and installing approximately 850 feet of 8‑inch ductile iron water main and associated appurtenances along North Olive Street. Bids are due December 3, 2025 at 2:00 PM Pacific; bid documents are provided electronically at no cost by AKS Engineering & Forestry.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Borough of Denver
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Borough of Denver
Close: Dec 15, 2025
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
AvailableCity of Tallahassee
Installation of approximately 2,505 linear feet of new water main and associated valves, services, meters, fire hydrants and fittings. The project also includes other items incidental to the infrastructure replacement, such as: sediment & erosion control; disposal of materials removed; maintenance of traffic, and restoration of disturbed areas including driveways, curb and gutter, pavement, site restoration and other related items as identified in the Contract Documents.
Posted Date
Nov 9, 2025
Due Date
Dec 18, 2025
Release: Nov 9, 2025
City of Tallahassee
Close: Dec 18, 2025
Installation of approximately 2,505 linear feet of new water main and associated valves, services, meters, fire hydrants and fittings. The project also includes other items incidental to the infrastructure replacement, such as: sediment & erosion control; disposal of materials removed; maintenance of traffic, and restoration of disturbed areas including driveways, curb and gutter, pavement, site restoration and other related items as identified in the Contract Documents.
AvailableBorough of Mount Joy
Water main replacement. Including 35 LF of 12" Ductile iron pipe; 1,640 LF of 8" Ductile iron pipe; 760 LF of 6" Ductile iron pipe; 75 LF bore and jack railroad crossing (solid); 30 ea ductile iron fitting; 5 ea fire hydrant assembly; 19 ea water service reconnect; 350 LF type K copper tubing; 100 LF curb and sidewalk restoration; 1,670 SY trench restoration permanent pavement; 3,400 SY mill and overlay permanent pavement; 250 CY miscellaneous rock excavation (contigency item); 75 LF bore and jack railroad crossing (contingency item rock);
Posted Date
Sep 19, 2025
Due Date
Jan 13, 2026
Release: Sep 19, 2025
Borough of Mount Joy
Close: Jan 13, 2026
Water main replacement. Including 35 LF of 12" Ductile iron pipe; 1,640 LF of 8" Ductile iron pipe; 760 LF of 6" Ductile iron pipe; 75 LF bore and jack railroad crossing (solid); 30 ea ductile iron fitting; 5 ea fire hydrant assembly; 19 ea water service reconnect; 350 LF type K copper tubing; 100 LF curb and sidewalk restoration; 1,670 SY trench restoration permanent pavement; 3,400 SY mill and overlay permanent pavement; 250 CY miscellaneous rock excavation (contigency item); 75 LF bore and jack railroad crossing (contingency item rock);
City of Schenectady
The City of Schenectady is soliciting sealed bids to replace the water main along Craig Street prior to planned complete streets work. Bids must be submitted via the City’s BidNet Direct portal by November 26, 2025, at 10:30 AM EST.
Posted Date
Nov 15, 2025
Due Date
Nov 26, 2025
Release: Nov 15, 2025
City of Schenectady
Close: Nov 26, 2025
The City of Schenectady is soliciting sealed bids to replace the water main along Craig Street prior to planned complete streets work. Bids must be submitted via the City’s BidNet Direct portal by November 26, 2025, at 10:30 AM EST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis