Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Pacifica seeks a consultant to develop approximately 10% design documents and a performance specification to replace PV arrays, inverters, and supporting equipment at the Calera Creek Water Recycling Plant. The deliverables will serve as bridging documents for a future design-build procurement; this is a professional services RFP, not a construction bid or grant program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
Posted Date
Oct 16, 2025
Due Date
Jan 20, 2026
Release: Oct 16, 2025
Close: Jan 20, 2026
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
AvailablePremium
Access the largest public sector contact database
Provide the conceptual design work for the natrium reactor head.
Posted Date
Oct 23, 2025
Due Date
Jan 5, 2026
Release: Oct 23, 2025
Close: Jan 5, 2026
Provide the conceptual design work for the natrium reactor head.
AvailableThe Town of East Hartford is seeking a design and permitting consultant to provide site analysis, conceptual design, preparation of construction documents, and assistance obtaining necessary permits for the Great River Park Improvement Project. The consultant will coordinate with town officials and stakeholders to ensure designs meet local regulations and support park facility and accessibility improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
The Town of East Hartford is seeking a design and permitting consultant to provide site analysis, conceptual design, preparation of construction documents, and assistance obtaining necessary permits for the Great River Park Improvement Project. The consultant will coordinate with town officials and stakeholders to ensure designs meet local regulations and support park facility and accessibility improvements.
AvailableThe work includes, but is not limited to, demolition of the library’s asphalt shingle roof with structural reinforcement of the wood rafters, selective roof deck replacement, installation of standing seam metal roof system and roof photovoltaic system; selective demolition at the adjacent municipal parking lot and installation of carport photovoltaic system, including delegated design for the carport structure; coordination with PECO electric for switchover; and site restoration.
Posted Date
Nov 9, 2025
Due Date
Dec 18, 2025
Release: Nov 9, 2025
Close: Dec 18, 2025
The work includes, but is not limited to, demolition of the library’s asphalt shingle roof with structural reinforcement of the wood rafters, selective roof deck replacement, installation of standing seam metal roof system and roof photovoltaic system; selective demolition at the adjacent municipal parking lot and installation of carport photovoltaic system, including delegated design for the carport structure; coordination with PECO electric for switchover; and site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis