Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide and install an uninterruptible power supply equipment at eligible locations throughout the school district.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Power supply, uninterruptible, NSN: 6130016018069, P/N: FA00001.
Posted Date
Dec 15, 2025
Due Date
Feb 9, 2026
Release: Dec 15, 2025
Close: Feb 9, 2026
Power supply, uninterruptible, NSN: 6130016018069, P/N: FA00001.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of uninterruptible power supply (ups) maintenance and repairs services on state property.
Posted Date
Nov 13, 2025
Due Date
Jan 28, 2026
Release: Nov 13, 2025
Close: Jan 28, 2026
Work consists of uninterruptible power supply (ups) maintenance and repairs services on state property.
AvailableReplacement of uninterruptible power supply (UPS) systems at three GCPL locations. This request is for OEM new Vertiv Liebert GXT5 Lithium Ion N Online UPS 2000VA/1800W 120V Tower/Rack units and matching external lithium ion battery cabinets at the following sites: Grayson (GRA), Norcross (NOR), and Snellville (SNE). The intent of this project is to replace existing lead acid UPS and battery systems with lithium ion technology to improve reliability, runtime stability, and lifecycle performance.
Posted Date
Dec 19, 2025
Due Date
Jan 30, 2026
Release: Dec 19, 2025
Close: Jan 30, 2026
Replacement of uninterruptible power supply (UPS) systems at three GCPL locations. This request is for OEM new Vertiv Liebert GXT5 Lithium Ion N Online UPS 2000VA/1800W 120V Tower/Rack units and matching external lithium ion battery cabinets at the following sites: Grayson (GRA), Norcross (NOR), and Snellville (SNE). The intent of this project is to replace existing lead acid UPS and battery systems with lithium ion technology to improve reliability, runtime stability, and lifecycle performance.
AvailablePerform uninterruptible power supply system repair services. Service includes remove and replace all internal components of the Schneider Symmetra PX 60 kW UPS.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Perform uninterruptible power supply system repair services. Service includes remove and replace all internal components of the Schneider Symmetra PX 60 kW UPS.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →