Summary
The City of Riverside (Public Utilities) solicits bids for the "Casa Blanca Substation Getaways Project," an Invitation for Bid to install underground electrical utility infrastructure at the Casa Blanca Substation. Work includes installation of vaults, pad‑mounted switch enclosures and junction cabinets, extensive conduit and trenching, protective bollards, asphalt paving, core‑drilling, and concrete demolition/replacement; contractors must provide a 10% bid guarantee and full payment and performance bonds. The project duration is 120 working days after Notice to Proceed with liquidated damages for delays, and the estimated contract value is approximately $1.4M (contracting earnings window cited roughly $1.2M–$1.6M).