Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project generally consists of improvements and asphalt pavement of approximately 1,450 LF of existing roadway. Work includes approx. 1 LS mobilization, 1 LS erosion control, 1 LS general grading, 56 LF 24" RCP drainage culvert, 93 LF radial guardrail.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The milling and resurfacing of Malcolm Avenue from Industrial Avenue to Borough limits. Contract work also includes minor curb and sidewalk improvements, ADA curb ramp reconstruction, and the resetting of existing castings. Base Bid 2 – United Lane Improvements The milling and resurfacing of United Lane from Malcolm Avenue to Bergen County Animal Shelter. Contract work also includes minor curb improvements, replacement of regulatory and warning signs, and reconstruction of inlets. Principal items of work in the project include: Base Bid 1: 4,520 SY HMA Milling, 3" or Less; 670 TON Hot Mix Asphalt 9.5M64 Surface Course; 425 LF of 9" x 18" Concrete Vertical Curb. Base Bid 2: 2,850 SY HMA Milling, 3" or Less; 420 TON Hot Mix Asphalt 9.5M64 Surface Course; 260 LF of 9" x 18" Concrete Vertical Curb.
Posted Date
Jan 13, 2026
Due Date
Feb 4, 2026
Release: Jan 13, 2026
Close: Feb 4, 2026
The milling and resurfacing of Malcolm Avenue from Industrial Avenue to Borough limits. Contract work also includes minor curb and sidewalk improvements, ADA curb ramp reconstruction, and the resetting of existing castings. Base Bid 2 – United Lane Improvements The milling and resurfacing of United Lane from Malcolm Avenue to Bergen County Animal Shelter. Contract work also includes minor curb improvements, replacement of regulatory and warning signs, and reconstruction of inlets. Principal items of work in the project include: Base Bid 1: 4,520 SY HMA Milling, 3" or Less; 670 TON Hot Mix Asphalt 9.5M64 Surface Course; 425 LF of 9" x 18" Concrete Vertical Curb. Base Bid 2: 2,850 SY HMA Milling, 3" or Less; 420 TON Hot Mix Asphalt 9.5M64 Surface Course; 260 LF of 9" x 18" Concrete Vertical Curb.
AvailableSmart scale - turn lane improvements - excavation, storm sewer pipe, aggregate base material, asphalt concrete, saw-cut asphalt concrete full depth, pavement marking, signs, portable temporary rumble strip array.
Posted Date
Jan 13, 2026
Due Date
Feb 25, 2026
Release: Jan 13, 2026
Close: Feb 25, 2026
Smart scale - turn lane improvements - excavation, storm sewer pipe, aggregate base material, asphalt concrete, saw-cut asphalt concrete full depth, pavement marking, signs, portable temporary rumble strip array.
AvailableThe City of San Marcos (TX) is soliciting sealed bids for the Thorpe Lane Sidewalk Improvements project to demolish and reconstruct sidewalks, driveways, curb ramps and reconfigure a pedestrian crossing to comply with PROWAG, with an estimated construction cost of $672,908.99. A non-mandatory pre-bid video conference is scheduled for 2026-01-27 at 2:00 PM; bids are due by 2026-02-19 at 2:00 PM local time. The contract requires bidders to submit a cashier's check, certified check, or acceptable bid bond equal to 5% of the bid.
Posted Date
Jan 18, 2026
Due Date
Feb 19, 2026
Release: Jan 18, 2026
Close: Feb 19, 2026
The City of San Marcos (TX) is soliciting sealed bids for the Thorpe Lane Sidewalk Improvements project to demolish and reconstruct sidewalks, driveways, curb ramps and reconfigure a pedestrian crossing to comply with PROWAG, with an estimated construction cost of $672,908.99. A non-mandatory pre-bid video conference is scheduled for 2026-01-27 at 2:00 PM; bids are due by 2026-02-19 at 2:00 PM local time. The contract requires bidders to submit a cashier's check, certified check, or acceptable bid bond equal to 5% of the bid.
AvailableWater distribution improvements project.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Water distribution improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis