Project include the replacement of the schools existing interior sewer lines that are sagged and blocked in the corridor areas. Lines in the existing corridors will be excavated and replaced, approximately 221 LF of sewer line replacement. The existing floor slab will be sawcut, removed and replaced after new lines are placed. There is approximately 106 SY of concrete slab removal and replacement. While excavation is open areas of existing sewer will be video recorded to assess the flow conditions. The existing terrazzo flooring, approximately 131 SY, will be replaced the entire length of the corridor, after new slab is complete.