Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace approx. 3,200 LF of 16" PVC transmission pipeline, and install an 800 KW backup generator with connections and controls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Peru west section line road bridge replacement design/build project.
Posted Date
Oct 31, 2025
Due Date
Dec 18, 2025
Release: Oct 31, 2025
Close: Dec 18, 2025
Peru west section line road bridge replacement design/build project.
AvailablePremium
Access the largest public sector contact database
Extend an existing 60 KV overhead transmission line to provide service to a new substation. The substation will be designed and constructed by Others. Extension will consist of two new structures to cut into the existing transmission line and drop into the new substation. The new transmission conductor to be installed for the substation spans is bundled 715 kcmil ACCR "Stilt". The conductor of the existing transmission line is bundled 954 kcmil AAC "Magnolia". Work includes the installation of 2 custom tubular steel monopoles supported on drilled concrete piers.
Posted Date
Nov 24, 2025
Due Date
Jan 8, 2026
Release: Nov 24, 2025
Close: Jan 8, 2026
Extend an existing 60 KV overhead transmission line to provide service to a new substation. The substation will be designed and constructed by Others. Extension will consist of two new structures to cut into the existing transmission line and drop into the new substation. The new transmission conductor to be installed for the substation spans is bundled 715 kcmil ACCR "Stilt". The conductor of the existing transmission line is bundled 954 kcmil AAC "Magnolia". Work includes the installation of 2 custom tubular steel monopoles supported on drilled concrete piers.
AvailableConstruction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
AvailableProvide surveying services for the ellis road bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Provide surveying services for the ellis road bridge replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis