Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work consists of cleaning, prep, crack seal, slurry coat, seal coat and restriping of the campus loop road and parking lots as indicated on the campus plan.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and placement of pavement markings, application of mastic and crack seal materials, asphalt patching, asphalt leveling, surface cleaning, and the application of slurry seal on designated streets.
Posted Date
Nov 21, 2025
Due Date
Jan 14, 2026
Release: Nov 21, 2025
Close: Jan 14, 2026
Removal and placement of pavement markings, application of mastic and crack seal materials, asphalt patching, asphalt leveling, surface cleaning, and the application of slurry seal on designated streets.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the Washington City Slurry Seal 2026 project, including the treatment of 280,403 square yards of roads with Type II Slurry Seal and 163,380 square yards with Type III Micro Surface.
Posted Date
Jan 6, 2026
Due Date
Jan 20, 2026
Release: Jan 6, 2026
Close: Jan 20, 2026
Procurement of services for the Washington City Slurry Seal 2026 project, including the treatment of 280,403 square yards of roads with Type II Slurry Seal and 163,380 square yards with Type III Micro Surface.
AvailableWork consists of removal of existing asphalt concrete pavement, ac repairs to 3" total depth, construct 6" ac dike, perform crack seal, asphalt surfacing, ARHM surfacing, type I and type II pme-rap slurry, reinstall pavement markings, striping, signage and traffic loops, adjust utility manholes and valves to grade, construct 6' wide swale, traffic control, construction survey. Work also includes 12,852 SF of remove and replace asphalt concrete pavement and/or subgrade to 3" total depth; 2,406 TON of construct 1.5" asphalt concrete base pavement; 1,275 LF of construct 6" wide drainage swale as shown on plans. Contractor to grade to drain; 510 LF of construct 6" ac HMA dike per county of riverside standard no. 212 and backfill 4" from top of curb; 12,776 SF of remove and replace asphalt concrete pavement and/or subgrade to 3" total depth. See attached files.
Posted Date
Jan 8, 2026
Due Date
Jan 15, 2026
Release: Jan 8, 2026
Close: Jan 15, 2026
Work consists of removal of existing asphalt concrete pavement, ac repairs to 3" total depth, construct 6" ac dike, perform crack seal, asphalt surfacing, ARHM surfacing, type I and type II pme-rap slurry, reinstall pavement markings, striping, signage and traffic loops, adjust utility manholes and valves to grade, construct 6' wide swale, traffic control, construction survey. Work also includes 12,852 SF of remove and replace asphalt concrete pavement and/or subgrade to 3" total depth; 2,406 TON of construct 1.5" asphalt concrete base pavement; 1,275 LF of construct 6" wide drainage swale as shown on plans. Contractor to grade to drain; 510 LF of construct 6" ac HMA dike per county of riverside standard no. 212 and backfill 4" from top of curb; 12,776 SF of remove and replace asphalt concrete pavement and/or subgrade to 3" total depth. See attached files.
AvailableWork includes South Campus Parking Lot construction.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Release: Dec 19, 2025
Close: Jan 15, 2026
Work includes South Campus Parking Lot construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →