Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project goals include: Restore connectivity between Campen Creek and adjacent floodplain habitats; improve habitat for salmonids, lamprey, and other native species; reduce flood and erosion risk; improve recreation opportunities. Work generally consists of the following:Remove fish (including lamprey) from in-water work areas and transfer outside of the Site, Isolate and dewater in-water work areas, Regrade approximately 1.3 acres of floodplain, totaling approximately 1,500 cubic yards of earthwork, Install wood habitat structures using large wood provided by Owner, Fell on-site hazard trees for use as salvage wood within wood habitat structures, Remove existing pedestrian bridge and portions of existing gravel trail, Provide and install new pedestrian bridge, Construct new trail (mix of gravel and wood chip surfacing), including drainage, as required, Provide and install a new garbage can for park users; and Hydroseed disturbed areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of the reconnection of a historic side channel, improving the connectivity to the floodplain while increasing critical flood refuge and salmonid-rearing habitat along the cedar river. The project will also include partially removing an existing revetment and constructing a new revetment end treatment extending off the remaining upstream portion of the rutledge johnson facility that is being left in place. The work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing; removing trash and miscellaneous abandoned infrastructure from the site; tree salvage; installing and maintaining temporary facilities; excavation and haul; grading; riprap removal; soil decompaction and amendment; placing and anchoring large woody debris; installing vertical buried log piles and perch poles; and installing a riprap revetment end treatment.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Project consists of the reconnection of a historic side channel, improving the connectivity to the floodplain while increasing critical flood refuge and salmonid-rearing habitat along the cedar river. The project will also include partially removing an existing revetment and constructing a new revetment end treatment extending off the remaining upstream portion of the rutledge johnson facility that is being left in place. The work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing; removing trash and miscellaneous abandoned infrastructure from the site; tree salvage; installing and maintaining temporary facilities; excavation and haul; grading; riprap removal; soil decompaction and amendment; placing and anchoring large woody debris; installing vertical buried log piles and perch poles; and installing a riprap revetment end treatment.
AvailableRestore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
Posted Date
Dec 10, 2025
Due Date
Dec 23, 2025
Release: Dec 10, 2025
Close: Dec 23, 2025
Restore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
Bid Proposals will be received by Mr. Bill Loder, Director of Operations for Swartz Creek Community Schools, in the Administration Building, 8354 Cappy Lane, Swartz Creek, MI, 48473, on or before 2:00 P.M. (local time) on December 19, 2025 (“Due Date”) or can mailed to the same address...
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Bid Proposals will be received by Mr. Bill Loder, Director of Operations for Swartz Creek Community Schools, in the Administration Building, 8354 Cappy Lane, Swartz Creek, MI, 48473, on or before 2:00 P.M. (local time) on December 19, 2025 (“Due Date”) or can mailed to the same address...
AvailableWork includes repair and remediation of the hospital creek bridge.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes repair and remediation of the hospital creek bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis