Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of phases 1 and 2 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs, sidewalk, and HMAC; water quality ponds; erosion & sedimentation controls; lot moisture conditioning; and various other improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Ysleta Independent School District is seeking proposals for the sale of Camino Real Middle School located at 9393 Alameda Avenue, El Paso, Texas. The offer period is listed as remaining open until an acceptable offer is received and the listing shows a close date of 2025-12-31 on the buyer portal linked from the aggregator.
Posted Date
May 11, 2023
Due Date
Dec 31, 2025
Release: May 11, 2023
Close: Dec 31, 2025
Ysleta Independent School District is seeking proposals for the sale of Camino Real Middle School located at 9393 Alameda Avenue, El Paso, Texas. The offer period is listed as remaining open until an acceptable offer is received and the listing shows a close date of 2025-12-31 on the buyer portal linked from the aggregator.
Premium
Access the largest public sector contact database
Replacement of Air Handler Units 4 and 5, including reconnection to the existing ductwork and building utilities.
Posted Date
Nov 20, 2025
Due Date
Dec 19, 2025
Release: Nov 20, 2025
Close: Dec 19, 2025
Replacement of Air Handler Units 4 and 5, including reconnection to the existing ductwork and building utilities.
AvailableThe work consists of providing temporary traffic control system and installing temporary traffic temporary traffic detection system; supplying of labor, materials, and equipment as required for removal of channelizing island, reconstruction of raised median and raised median extension; removal of existing traffic island and installation of new curb return, sidewalk, gutter, and curb ramps; ramps; new pcc curbs, roadside signs, traffic detectors, conduit, conductors, pull boxes, traffic signal poles, traffic detection and monitoring cameras, removal and replacement of traffic stripes, pavement markings, and pavement markers; furnishing and installing traffic signs, utility coordination; installation and removal of landscaping and bioretention area, removal of existing and installation of new inlet and piping; relocation of vta bus stop, relocation of fire hydrant, relocation of case vent pipe
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The work consists of providing temporary traffic control system and installing temporary traffic temporary traffic detection system; supplying of labor, materials, and equipment as required for removal of channelizing island, reconstruction of raised median and raised median extension; removal of existing traffic island and installation of new curb return, sidewalk, gutter, and curb ramps; ramps; new pcc curbs, roadside signs, traffic detectors, conduit, conductors, pull boxes, traffic signal poles, traffic detection and monitoring cameras, removal and replacement of traffic stripes, pavement markings, and pavement markers; furnishing and installing traffic signs, utility coordination; installation and removal of landscaping and bioretention area, removal of existing and installation of new inlet and piping; relocation of vta bus stop, relocation of fire hydrant, relocation of case vent pipe
AvailableStreet streetscape and roadway improvements.
Posted Date
Dec 12, 2025
Due Date
Feb 5, 2026
Release: Dec 12, 2025
Close: Feb 5, 2026
Street streetscape and roadway improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis