Summary
Work consists of 160 lf of remove existing plaster (pool), 160 lf of new pool plaster, 40 lf of remove existing plaster (spa), 40 lf of new spa plaster, 160 lf of water line tile cleaning (pool), 40 lf of water line tile cleaning (spa), 3 ea of led pool and spa lights, 190 lf of brick clay coping sealer, 4,000 sf of cool deck repair and paint, 32 ea of depth markings pool and spa (16 inside pool, 16 on deck), electrical - new wiring for pool and spa lights, include junction box and gfci. Cut and trench concrete to run new electrical conduit: install wiring: patch concrete and cool deck. See attached file.