Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes approx 16,378 SF new construction with site work of a caliber collision repair center. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes new construction with site work of a 13,250.00 SF service station. This project is being bid with open shop labor.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Work includes new construction with site work of a 13,250.00 SF service station. This project is being bid with open shop labor.
AvailablePremium
Access the largest public sector contact database
Work includes approx 112,150 SF tilt industrial building on an 8.35-acre site. The scope of work consists of but is not limited to the following: erosion control, grading, soil remediation (included in the base bid),storm, utilities, asphalt paving, site concrete, walks, dumpster enclosure, landscaping, concrete, tilt concrete, structural and misc. steel, roofing, waterproofing, joint sealants, ACM, hollow metal, door hardware, storefront, overhead doors and equipment, metal framing, drywall, painting, sprinker, DESIGN-BUILD PME. See outside link.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work includes approx 112,150 SF tilt industrial building on an 8.35-acre site. The scope of work consists of but is not limited to the following: erosion control, grading, soil remediation (included in the base bid),storm, utilities, asphalt paving, site concrete, walks, dumpster enclosure, landscaping, concrete, tilt concrete, structural and misc. steel, roofing, waterproofing, joint sealants, ACM, hollow metal, door hardware, storefront, overhead doors and equipment, metal framing, drywall, painting, sprinker, DESIGN-BUILD PME. See outside link.
AvailableThe North Carolina Department of Public Safety – NC National Guard (NCNG) - Construction Facilities Management Office (CFMO) is seeking a contractor to replace the existing chain link fence at the Joint Force Headquarters Complex with a new fence that matches or blends with the existing ornament fence.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
The North Carolina Department of Public Safety – NC National Guard (NCNG) - Construction Facilities Management Office (CFMO) is seeking a contractor to replace the existing chain link fence at the Joint Force Headquarters Complex with a new fence that matches or blends with the existing ornament fence.
AvailableProvide auto body collision and repair services to Metro fleet vehicles. Vendor shall provide auto body collision and repair services of Metro’s vehicles as needed. Vehicles damage may be from a collision, vandalism, or impact.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Close: Dec 17, 2025
Provide auto body collision and repair services to Metro fleet vehicles. Vendor shall provide auto body collision and repair services of Metro’s vehicles as needed. Vehicles damage may be from a collision, vandalism, or impact.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis