Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removing existing tables and benches and installing replacement cafeteria tables, benches, and in wall storage pockets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Photovoltaic system installation. The Project consists of installation of Photovoltaic Systems, Battery Electric Storage Systems and appurtenances. The proposed PV system shall be configured as a Net Metered interconnection. The point of interconnection shall be the electric distribution system serving the Authority’s Water Treatment Plant.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
Photovoltaic system installation. The Project consists of installation of Photovoltaic Systems, Battery Electric Storage Systems and appurtenances. The proposed PV system shall be configured as a Net Metered interconnection. The point of interconnection shall be the electric distribution system serving the Authority’s Water Treatment Plant.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of contract no. 1: general construction; contract no. 3: electrical construction; contract no. 2: hvac construction; contract no. 4: plumbing construction. See attached file.
Posted Date
Nov 26, 2025
Due Date
Jan 21, 2026
Release: Nov 26, 2025
Close: Jan 21, 2026
Project consists of contract no. 1: general construction; contract no. 3: electrical construction; contract no. 2: hvac construction; contract no. 4: plumbing construction. See attached file.
AvailableProject includes tables, chairs, caddies.
Posted Date
-
Due Date
Jan 19, 2026
Release: -
Close: Jan 19, 2026
Project includes tables, chairs, caddies.
AvailableLabor & materials for shower installation project for the ashland fire department.
Posted Date
Dec 15, 2025
Due Date
Jan 8, 2026
Release: Dec 15, 2025
Close: Jan 8, 2026
Labor & materials for shower installation project for the ashland fire department.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →