Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Wayne
Provide bypass pump rentals for emergency and scheduled use by the township.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Seattle
Provide mobilization, setup, operation, monitoring, and demobilization of pump and bypass systems for drainage and wastewater conveyance. These services are required for both planned events, such as King Tides, and unplanned emergencies. The selected vendor will coordinate closely with the City, supply skilled crews with proper PPE, and use equipment capable of transporting and operating multiple sized pump and bypass units. Vendors must be capable of rapid deployment, including participation in pre-event planning and decision meetings for King Tide events.
Posted Date
Sep 10, 2025
Due Date
Dec 4, 2025
Release: Sep 10, 2025
City of Seattle
Close: Dec 4, 2025
Provide mobilization, setup, operation, monitoring, and demobilization of pump and bypass systems for drainage and wastewater conveyance. These services are required for both planned events, such as King Tides, and unplanned emergencies. The selected vendor will coordinate closely with the City, supply skilled crews with proper PPE, and use equipment capable of transporting and operating multiple sized pump and bypass units. Vendors must be capable of rapid deployment, including participation in pre-event planning and decision meetings for King Tide events.
AvailableCity of Kingsland
The City of Kingsland is seeking proposals for the purchase of a Sewer Bypass Pump. Specifications include a 6"x6" size, max flow of 2,500-3,000 gpm, max head of 182', and a 4-cylinder diesel engine. The pump must have a mechanically driven diaphragm-style vacuum pump priming system and indefinite run-dry capability. Proposals must include standard and extended warranty options.
Posted Date
-
Due Date
Dec 11, 2025
Release: -
City of Kingsland
Close: Dec 11, 2025
The City of Kingsland is seeking proposals for the purchase of a Sewer Bypass Pump. Specifications include a 6"x6" size, max flow of 2,500-3,000 gpm, max head of 182', and a 4-cylinder diesel engine. The pump must have a mechanically driven diaphragm-style vacuum pump priming system and indefinite run-dry capability. Proposals must include standard and extended warranty options.
AvailableCity of Kingsland
The City of Kingsland is seeking proposals for the purchase of a Sewer Bypass Pump. Specifications include a 6"x6" size, max flow of 2,500-3,000 gpm, max head of 182', and a 4-cylinder diesel engine. The pump must have a mechanically driven diaphragm-style vacuum pump priming system and indefinite run-dry capability. Proposals must include standard and extended warranty options.
Posted Date
-
Due Date
Dec 11, 2025
Release: -
City of Kingsland
Close: Dec 11, 2025
The City of Kingsland is seeking proposals for the purchase of a Sewer Bypass Pump. Specifications include a 6"x6" size, max flow of 2,500-3,000 gpm, max head of 182', and a 4-cylinder diesel engine. The pump must have a mechanically driven diaphragm-style vacuum pump priming system and indefinite run-dry capability. Proposals must include standard and extended warranty options.
AvailableCity of McAllen
The work consists of the construction of two (2) pump bypass structures. Work includes concrete box structures, earth embankment and grading, and levee road reconstruction.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
City of McAllen
Close: Dec 9, 2025
The work consists of the construction of two (2) pump bypass structures. Work includes concrete box structures, earth embankment and grading, and levee road reconstruction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis