Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Building T in area "4" includes, but not limited to, replacement of variable air volume boxes, removal of all pneumatic controls, installation of new direct digital controls system, installation of new direct digital controls related to the variable air volume boxes, and related electric power to those boxes and controls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Full HVAC replacement for a 74,078 GSF building, to include new mechanical rooms, mechanical shafts, roof top equipment, associated partial demolition of building components to accommodate the HVAC replacement, and associated structural and electrical work.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Full HVAC replacement for a 74,078 GSF building, to include new mechanical rooms, mechanical shafts, roof top equipment, associated partial demolition of building components to accommodate the HVAC replacement, and associated structural and electrical work.
AvailablePremium
Access the largest public sector contact database
RTU replacement - phase 1.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
RTU replacement - phase 1.
AvailableWork includes replace existing HVAC indoor air handlers, controls, and outdoor heat pumps.
Posted Date
Dec 4, 2025
Due Date
Dec 16, 2025
Release: Dec 4, 2025
Close: Dec 16, 2025
Work includes replace existing HVAC indoor air handlers, controls, and outdoor heat pumps.
AvailableTopeka Public Schools (USD #501) is soliciting bids for the Chase Middle School HVAC Replacement - Phase 5, which includes demolition and replacement of air terminal units, unit heaters, fan coil units, ductwork, piping, controls, grills, diffusers, and installation of electric heating fan coils and unit heaters. A mandatory pre-bid meeting is scheduled for 2025-12-12 at 11:00 AM EST, and bids are due on 2025-12-19 at 2:00 PM EST. The project is expected to start around 2026-01-09 with a projected duration of 195 days.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Topeka Public Schools (USD #501) is soliciting bids for the Chase Middle School HVAC Replacement - Phase 5, which includes demolition and replacement of air terminal units, unit heaters, fan coil units, ductwork, piping, controls, grills, diffusers, and installation of electric heating fan coils and unit heaters. A mandatory pre-bid meeting is scheduled for 2025-12-12 at 11:00 AM EST, and bids are due on 2025-12-19 at 2:00 PM EST. The project is expected to start around 2026-01-09 with a projected duration of 195 days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis