Summary
Provide building 46 repair room 517. This requirement is to change room 517 from a supply room to a one-person office. Building 46 has a room that is not being utilized as designed. The customer would like this room to be reconfigured to be a single office. SPECIFIC REQUIREMENTS: Hang heavy duty plastic with center zipper to cover the opening to room 517. Remove all shelving and brackets. Delivery to building 59 and load onto racks where directed. Prepare all walls and ceilings to level 4 IAW GA 214. The contractor must use a dustless sanding vacuum system when preparing the walls to minimize dust. No dust can migrate out of the breakroom. Use of an additional HEPA filter vacuum system in addition to the dustless sanding is required. Submit a separate dust plan for approval. Prime and paint a minimum of 2 coats of satin sheen paint (IAW MPI), off white, provide samples for the exact choice. Add ¾” 3’x3’ plywood on the wall the door is located for a TV to be mounted. TV, mount etc. not in contract. Paint the plywood. Add an electrical outlet on the wall the door is in 6’AFF for the TV. Run new 12-gauge wire from electrical room 514. Add a single gang data box with 1” conduit next to the TV outlet. Run the conduct to the cable tray just outside the office. Provide pull string. On the wall to the right of the door as you enter, add a single gang box with ¾” conduit, centered in the wall. Run the conduct to the cable tray just outside the office. Provide pull string. Add a single gang electrical outlet next to the new data box. The new wire run from room 514 can also be used for this outlet. See attached file.