Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The California Department of State Hospitals is soliciting bids to install temporary/auxiliary electrical and piping connections for a mobile air-cooled chiller serving Building 197. The contractor must provide all materials, equipment, labor, permits, insurance, bonds, and comply with prevailing wage and DIR registration requirements. A mandatory pre-bid conference is scheduled and the solicitation is an Invitation for Bid (sell event) with a closing date listed on the buyer site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide all labor, material, supplies, transportation, permits, license and qualified supervision for project 565-24-113, replace auxiliary chiller.
Posted Date
Nov 17, 2025
Due Date
Jan 26, 2026
Release: Nov 17, 2025
Close: Jan 26, 2026
Provide all labor, material, supplies, transportation, permits, license and qualified supervision for project 565-24-113, replace auxiliary chiller.
AvailablePremium
Access the largest public sector contact database
The Department of Veterans Affairs (VISN 6: Mid-Atlantic Health Care Network) issued Solicitation 36C24626B0004 to remove and replace the existing 120-ton auxiliary chiller at Building 3 located at 2300 Ramsey Street, Fayetteville, NC. The work includes replacement/installation of piping, valves, supports, controls, integration with the existing Building Automation System (BACNET-compliant controller), replacement of two 250 gpm pumps, and updating BAS graphics and alarms; all work must comply with VA master specifications, NFPA, and UL standards. Period of performance is six months from Notice to Proceed; the posting is open on SAM.gov and is NOT a grant.
Posted Date
Dec 9, 2025
Due Date
Jan 26, 2026
Release: Dec 9, 2025
Close: Jan 26, 2026
The Department of Veterans Affairs (VISN 6: Mid-Atlantic Health Care Network) issued Solicitation 36C24626B0004 to remove and replace the existing 120-ton auxiliary chiller at Building 3 located at 2300 Ramsey Street, Fayetteville, NC. The work includes replacement/installation of piping, valves, supports, controls, integration with the existing Building Automation System (BACNET-compliant controller), replacement of two 250 gpm pumps, and updating BAS graphics and alarms; all work must comply with VA master specifications, NFPA, and UL standards. Period of performance is six months from Notice to Proceed; the posting is open on SAM.gov and is NOT a grant.
AvailableRelease: Dec 8, 2025
Close: Jan 13, 2026
Provide chiller cross-connection study.
AvailableBrown County solicits professional engineering/consulting services to perform a chiller cross-connection study for the Resch Expo and Resch Center—site assessment, analysis of chiller connections, and a written study with recommendations per the posted scope (Attachment 1). RFQ requires submission of a cost sheet, designated project manager, required insurance, and attendance at the mandatory site visit; vendors must accept County contract terms and provide required documentation.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Brown County solicits professional engineering/consulting services to perform a chiller cross-connection study for the Resch Expo and Resch Center—site assessment, analysis of chiller connections, and a written study with recommendations per the posted scope (Attachment 1). RFQ requires submission of a cost sheet, designated project manager, required insurance, and attendance at the mandatory site visit; vendors must accept County contract terms and provide required documentation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis