Retrieving RFP details
Release
Close
Fort Peck Assiniboine & Sioux Tribes
The work generally consists of construction of a new 3-cell sewer lagoon, a new package lift station, 1,190 LF of 10" gravity sewer main, and 900 LF of 6" sewer force main. The new sewer lagoon will include approx. 150,000 CY of excavation and embankment, 71,700 SY of PVC liner, lagoon venting system, 12" of protective clay liner cover, 18,500 SY of rip rap, lagoon piping and appurtenances, and barbwire fencing.
New Hampshire Department of Natural and Cultural Resources
Conduct a feasibility study for modernization of the Mt. Sunapee sewage lagoons including upgrades to the spray fields and potential replacement with other technology. Qualified firms should demonstrate extensive experience in wastewater treatment, lagoon system upgrades, and innovative reclamation technologies, with a proven track record of similar projects in recreational or environmental settings.
City of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
City of Fort Wayne
Contractor shall furnish all labor, insurance, equipment, materials and power for the complete performance of the following project, Maplewood Lift Station Rehab as follows: Replacement of Pumps, Valves, and electrical panel for Maplewood Lift Station.
Boone County Regional Sewer District
Work includes : 1 LS lift station platform; 1 LS lift station mechanical rehabilition; 1 LS bypass pumping; 57 LF 8-foot tall wood fence; see outside link.
Release
Oct 01, 2024
Close
Oct 29, 2024