Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,348 LB reinforcing steel, stainless steel; 101 LF concrete barrier railing; 99.9 LF structural steel pedestrian hand railing; 117.2 LF structural steel railing traffic; 4,350 LF piles, steel, HP 10 x 42; 623 CY excavation, class 10, channel; 298 CY fiber reinforcement for structural concrete; 310.8 LF concrete encasement of steel H piles, HP 10 X 42 (P10L type 3); 724.1 ton revetment, class E; 138 LF concrete barrier (pedestrian/traffic); 225 SY recreational trail, portland cement concrete, 6"; 112.5 LF steel beam guardrail; 223 LF culvert, concrete roadway pipe, 24" dia.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
AvailableThe work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
AvailableThe work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
AvailableThe work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis