Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
Premium
Access the largest public sector contact database
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The work consist of approx bridge replacement; 1,407 CY furnished excavation; 137 SY pavement connector for bridge approach slab; 602 SY bridge deck grooving; 367 SY hot mix asphalt surface removal - butt joint; 159.3 concrete superstructure.
AvailableWork includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
AvailableBridge washing of 5 structures.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Bridge washing of 5 structures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis