Summary
The City of Worcester Department of Public Works is soliciting bids for the rehabilitation of three bridge structures within the city: June Street over Tatnuck Brook (Bridge No. W-44-003), Mower Street over Tatnuck Brook (Bridge No. W-44-001), and NE Cutoff over Poor Farm Brook (Bridge No. W-44-139). The work includes masonry arch, culvert, and concrete repairs; crack sealing and grout injection; spall repairs; slope stabilization and erosion control; sidewalk and pavement restoration; guardrail replacement; traffic management and pedestrian accommodations; and water control operations. Bidders must be prequalified by MassDOT in the Bridge - Construction category, with an estimated contract value of $395,848.09 and contract completion required by November 15, 2027.