Summary
Work consists of bridge deck replacement and small structure pipe lining. Includes 127 SY of pavement removal; 180 LF of paved side ditch, remove; 47 SY of curb and gutter turnout, remove; 385 CY of excavation, common; 3 ton of HMA patching, partial depth, type b; 520 LF of guardrail, remove; 292 SY of reinforced concrete bridge approach, 12"; 212 SY of geotextile for riprap, type 1a; 166 SY of geotextile for riprap, type 1b; 1,572 SY of mulched seeding, type r; 163 LF of pipe liner, cured-in-place, min. Area 30. 1 sft; 200 SF of patching concrete structures; 786 LF of line, paint, solid, white, 6"; 786 LF of line, paint, solid, yellow, 6"; see outside link & attached file.