Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 14' DIA of aeration digester w/ decanter, chemical feed building and equipment, decant pumps, blower motors, electrical, piping, and site work for a fully functioning system as shown in the plans and specifications. See outside link for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 497 LF temporary fence; 4931 CY earth excavation; 2438 CY topsoil excavation and placement; 11907 SY erosion control blanket; 1218 SY heavy duty erosion control blanket; 5106 LF perimeter erosion barrier; 44 SY stone riprap, class a3; 14122 SY aggregate subgrade improvement 12"; 682 sy portland cement concrete base course widening 8"; 65 SY hot-mix asphalt surface removal - butt joint; 350 SY pavement patching, type ii, 8"; 5320 SY structure excavation; 545 LF bridge fence railing, curved; 285 LF storm sewers, class a, type 2 15"; 5 EA fire hydrants to be moved; 2 EA manholes to be adjusted; 559 LF temporary pavement marking - line 6" - epoxy.
Posted Date
Nov 4, 2025
Due Date
Jan 8, 2026
Release: Nov 4, 2025
Close: Jan 8, 2026
Premium
Access the largest public sector contact database
Work includes 497 LF temporary fence; 4931 CY earth excavation; 2438 CY topsoil excavation and placement; 11907 SY erosion control blanket; 1218 SY heavy duty erosion control blanket; 5106 LF perimeter erosion barrier; 44 SY stone riprap, class a3; 14122 SY aggregate subgrade improvement 12"; 682 sy portland cement concrete base course widening 8"; 65 SY hot-mix asphalt surface removal - butt joint; 350 SY pavement patching, type ii, 8"; 5320 SY structure excavation; 545 LF bridge fence railing, curved; 285 LF storm sewers, class a, type 2 15"; 5 EA fire hydrants to be moved; 2 EA manholes to be adjusted; 559 LF temporary pavement marking - line 6" - epoxy.
WWTP process, disinfection and electrical improvements, Phase II.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
WWTP process, disinfection and electrical improvements, Phase II.
AvailableWork includes repair and remediation of the hospital creek bridge.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes repair and remediation of the hospital creek bridge.
AvailableBridge 9 pier 4 improvements for the public works department.
Posted Date
Dec 9, 2025
Due Date
Dec 30, 2025
Release: Dec 9, 2025
Close: Dec 30, 2025
Bridge 9 pier 4 improvements for the public works department.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis