Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installing cat6 cabling from central equipment rooms to all drops; securing, labeling, fire-stopping, and testing all cabling per ansi/tia/eia, nec/nfpa, and bicsi tdmm standards; removing unused cabling; supplying and installing rack-mount patch panels and patch cables; providing digital and hardcopy test results plus as-built electronic documentation; and performing most work during non-business hours.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Network Infrastructure/Structured Cabling Materials.
Posted Date
Dec 12, 2025
Due Date
Jan 26, 2026
Release: Dec 12, 2025
Close: Jan 26, 2026
Network Infrastructure/Structured Cabling Materials.
AvailableThe Scope of Work for this Contract includes the following: Structured Cabling; Campus Backbone Structured Cabling; Moves, Adds & Changes (Maintenance); PA system cabling; Access Control/Security Camera cabling; Cable Demolition/Removal; Network Closet Installation / Reconfiguration / Removal; Audio-Video.
Posted Date
Dec 12, 2025
Due Date
Jan 26, 2026
Release: Dec 12, 2025
Close: Jan 26, 2026
The Scope of Work for this Contract includes the following: Structured Cabling; Campus Backbone Structured Cabling; Moves, Adds & Changes (Maintenance); PA system cabling; Access Control/Security Camera cabling; Cable Demolition/Removal; Network Closet Installation / Reconfiguration / Removal; Audio-Video.
AvailableThornapple Kellogg Schools is soliciting proposals to provide low-voltage structured cabling services for two school buildings, including installation of Category 6e cabling, data jacks, testing, documentation, and a warranty. The vendor must supply all materials, labor, and equipment and complete the project within the district’s stated project duration. Bids are due on 2026-02-11 and the solicitation is a procurement RFP (not a grant).
Posted Date
Jan 8, 2026
Due Date
Feb 11, 2026
Release: Jan 8, 2026
Close: Feb 11, 2026
Thornapple Kellogg Schools is soliciting proposals to provide low-voltage structured cabling services for two school buildings, including installation of Category 6e cabling, data jacks, testing, documentation, and a warranty. The vendor must supply all materials, labor, and equipment and complete the project within the district’s stated project duration. Bids are due on 2026-02-11 and the solicitation is a procurement RFP (not a grant).
Complete Phase 4 of district-wide network data cabling capacity improvements at multiple elementary school sites. The work includes Category 6A and Category 6 horizontal cabling, single-mode fiber backbone cabling, and associated pathways and infrastructure. The Phase 4 scope includes installation of new structured copper and fiber optic cabling, replacement or augmentation of existing cabling where capacity is insufficient, support for wireless access points, clocks, intercom systems, and other network-connected devices, associated pathways, terminations, testing, labeling, and documentation.
Posted Date
Jan 20, 2026
Due Date
Feb 23, 2026
Release: Jan 20, 2026
Close: Feb 23, 2026
Complete Phase 4 of district-wide network data cabling capacity improvements at multiple elementary school sites. The work includes Category 6A and Category 6 horizontal cabling, single-mode fiber backbone cabling, and associated pathways and infrastructure. The Phase 4 scope includes installation of new structured copper and fiber optic cabling, replacement or augmentation of existing cabling where capacity is insufficient, support for wireless access points, clocks, intercom systems, and other network-connected devices, associated pathways, terminations, testing, labeling, and documentation.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis