Summary
The contractor shall perform the following tasks: Site Assessment and Verification: Visually inspect the existing hoist, trolley, monorail and control panel to confirm the specific models and
power supply. Verify all existing electrical and mechanical connection points. Decommissioning and Removal: Follow all lock-out/tag-out procedures to safely de-energize the hoist and trolley. Disconnect all electrical and mechanical components of the existing braking system. Carefully remove the old brake assembly from the hoist. Dispose of the removed components in accordance with environmental regulations. See attached file.