Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves repairs to the br14. 85 bridge walkway and handrails which are utilized for maintenance and inspection access. The work along the walkway will include the removal of broken concrete sections and installation of new concrete, including the removal and replacement of damaged rebar. Additionally, handrail posts and handrail cables need to be removed and replaced at indicated locations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Repair storm damage.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
Repair storm damage.
AvailableRepair storm and snow damage.
Posted Date
Nov 14, 2025
Due Date
Jan 6, 2026
Release: Nov 14, 2025
Close: Jan 6, 2026
Repair storm and snow damage.
AvailableThe USDA Forest Service is soliciting proposals (Solicitation No. 127EAW26R0002) for the Groveland Storm Damage Repair project on the Stanislaus National Forest. The solicitation is a Total Small Business set-aside and requires site inspection (failure to inspect will not be grounds for claim after award). All solicitation documents are provided as attachments on the SAM.gov posting and RFI responses will be handled via amendments.
Posted Date
Dec 8, 2025
Due Date
Jan 12, 2026
Release: Dec 8, 2025
Close: Jan 12, 2026
The USDA Forest Service is soliciting proposals (Solicitation No. 127EAW26R0002) for the Groveland Storm Damage Repair project on the Stanislaus National Forest. The solicitation is a Total Small Business set-aside and requires site inspection (failure to inspect will not be grounds for claim after award). All solicitation documents are provided as attachments on the SAM.gov posting and RFI responses will be handled via amendments.
The U.S. Forest Service (Stanislaus National Forest) is soliciting contractors to repair storm damage and landslides on two forest roads near Harden Flat, CA, including construction of retaining structures, re-establishing the road prism, resurfacing, vegetation clearing, drainage construction, and erosion control. The procurement is a Total Small Business set-aside under NAICS 237310 (Highway, Street, and Bridge Construction) and is funded as an ERFO (Federal Highways Emergency Relief for Federally Owned Roads) type repair. The solicitation is active on SAM.gov with a contracting office contact (Tanya Torres) and an expected performance in the Groveland area of Tuolumne County, California.
Posted Date
Dec 8, 2025
Due Date
Jan 12, 2026
Release: Dec 8, 2025
Close: Jan 12, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Forest Service (Stanislaus National Forest) is soliciting contractors to repair storm damage and landslides on two forest roads near Harden Flat, CA, including construction of retaining structures, re-establishing the road prism, resurfacing, vegetation clearing, drainage construction, and erosion control. The procurement is a Total Small Business set-aside under NAICS 237310 (Highway, Street, and Bridge Construction) and is funded as an ERFO (Federal Highways Emergency Relief for Federally Owned Roads) type repair. The solicitation is active on SAM.gov with a contracting office contact (Tanya Torres) and an expected performance in the Groveland area of Tuolumne County, California.