Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a hydrogen electrolyzer at bosch facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This Project Involves Removal And Replacement Of Ahu 4 & 9 In Mechanical Rooms 111-209 And 111-210. Removal And Replacement Of Exterior Wall Louver And Air Intake Curbs. Replacement of air handlers 4 and 9. Mechanical and electrical work as dictated in bid drawing set. Units tied in and configured into our Metasys BMS. Alternates 1. Provide New Rusking Louver match existing louver finish. Provide blankoff panels where louver is inactive - refer to mechanical for extent of black-off panel.
Posted Date
Dec 1, 2025
Due Date
Jan 28, 2026
Release: Dec 1, 2025
Close: Jan 28, 2026
This Project Involves Removal And Replacement Of Ahu 4 & 9 In Mechanical Rooms 111-209 And 111-210. Removal And Replacement Of Exterior Wall Louver And Air Intake Curbs. Replacement of air handlers 4 and 9. Mechanical and electrical work as dictated in bid drawing set. Units tied in and configured into our Metasys BMS. Alternates 1. Provide New Rusking Louver match existing louver finish. Provide blankoff panels where louver is inactive - refer to mechanical for extent of black-off panel.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The North Dakota Department of Corrections and Rehabilitation (DOCR) is soliciting bids to purchase Bosch surveillance equipment, including cameras, accessories, and associated warranty support, with evaluation based on the highest percentage discount off MSRP. The contract term begins January 1, 2026 through December 31, 2027 with options to renew for up to two additional 12-month periods; bidders must be authorized Bosch dealers and provide a minimum three-year parts warranty.
Posted Date
-
Due Date
Dec 16, 2027
Release: -
Close: Dec 16, 2027
The North Dakota Department of Corrections and Rehabilitation (DOCR) is soliciting bids to purchase Bosch surveillance equipment, including cameras, accessories, and associated warranty support, with evaluation based on the highest percentage discount off MSRP. The contract term begins January 1, 2026 through December 31, 2027 with options to renew for up to two additional 12-month periods; bidders must be authorized Bosch dealers and provide a minimum three-year parts warranty.
AvailableInstallation of one full access driveway and one right-in right-out driveway, including site clearing, grading, and associated infrastructure for a future industrial park.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Installation of one full access driveway and one right-in right-out driveway, including site clearing, grading, and associated infrastructure for a future industrial park.
AvailableThe Scope of Work for this Contract includes the following: Structured Cabling; Campus Backbone Structured Cabling; Moves, Adds & Changes (Maintenance); PA system cabling; Access Control/Security Camera cabling; Cable Demolition/Removal; Network Closet Installation / Reconfiguration / Removal; Audio-Video.
Posted Date
Dec 12, 2025
Due Date
Jan 26, 2026
Release: Dec 12, 2025
Close: Jan 26, 2026
The Scope of Work for this Contract includes the following: Structured Cabling; Campus Backbone Structured Cabling; Moves, Adds & Changes (Maintenance); PA system cabling; Access Control/Security Camera cabling; Cable Demolition/Removal; Network Closet Installation / Reconfiguration / Removal; Audio-Video.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →