Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Boiler replacement at middle school.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
HVAC upgrades and boiler replacement at middle school
Posted Date
Nov 11, 2025
Due Date
Jan 14, 2026
Release: Nov 11, 2025
Close: Jan 14, 2026
HVAC upgrades and boiler replacement at middle school
AvailablePremium
Access the largest public sector contact database
Replacement of existing roof system throughout Middle School.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Replacement of existing roof system throughout Middle School.
AvailableThe Piccowaxen Middle School Boiler Replacement Project seeks to replacement of (2) existing oil-fired hot water boilers, flues, air dirt separator, chemical shot feeder, expansion tank, and all associated equipment. The hot water piping associated with the (2) boilers will be replaced up to the (2) existing main building circulator pumps. Fuel oil piping will be replaced downstream of the boilers in the mechanical equipment room. The boiler fuel oil connections will be outfitted with fuel oil transfer tanks, strainers, and standard valves to enhance burner efficiency. The boilers will be hooked up to the existing building control system.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
The Piccowaxen Middle School Boiler Replacement Project seeks to replacement of (2) existing oil-fired hot water boilers, flues, air dirt separator, chemical shot feeder, expansion tank, and all associated equipment. The hot water piping associated with the (2) boilers will be replaced up to the (2) existing main building circulator pumps. Fuel oil piping will be replaced downstream of the boilers in the mechanical equipment room. The boiler fuel oil connections will be outfitted with fuel oil transfer tanks, strainers, and standard valves to enhance burner efficiency. The boilers will be hooked up to the existing building control system.
AvailableProvide boiler replacement.
Posted Date
Dec 14, 2025
Due Date
Dec 29, 2025
Release: Dec 14, 2025
Close: Dec 29, 2025
Provide boiler replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis