Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Public Schools - Series II. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The State of Hawaii’s Department of Hawaiian Home Lands is seeking a developer to design and construct on‑ and off‑site infrastructure and to design, construct, finance, and market approximately 400‑500 multi‑family townhomes within a 32.6‑acre residential development in East Kapolei II II‑A. The project supports affordable housing for eligible Native Hawaiians and includes associated parks and roadway improvements.
Posted Date
Nov 6, 2025
Due Date
Jan 6, 2026
Release: Nov 6, 2025
Close: Jan 6, 2026
The State of Hawaii’s Department of Hawaiian Home Lands is seeking a developer to design and construct on‑ and off‑site infrastructure and to design, construct, finance, and market approximately 400‑500 multi‑family townhomes within a 32.6‑acre residential development in East Kapolei II II‑A. The project supports affordable housing for eligible Native Hawaiians and includes associated parks and roadway improvements.
Premium
Access the largest public sector contact database
This project will renovate seven (7) Men's public restrooms, seven (7) Women’s public restrooms and two (2) Companion Care public restrooms located on the first, second and third floors of the terminal building in both sterile and non-sterile areas. All of the work will be done within the existing footprint of each bathroom and will include demolition of existing finishes with the existing terrazzo floor remaining in place and all plumbing fixtures and finishes to be replaced. The work generally includes: General Construction: The general contractor shall be responsible for taking the lead role for the purpose of coordination between disciplines to ensure the work is completed as shown on the plans and specified. Work for renovation generally includes new drywall ceilings; new acoustical ceiling tile and grid; new moisture-resistant wall board behind all new wall tile; remove and replace damaged metal studs; new tile floor shall be sloped to existing drain locations; new toilet partitions and toilet accessories; new AerDec Sink System and structural supports; new internally illuminated panel system at entry; new counter mounted panel system; Interior painting; new door, frame, and hardware; new signage. Mechanical: Work for renovation generally includes new supply and return air diffusers in accordance with new ACT ceiling and drywall ceilings; Test, balance and commission system, new toilets, flushometers, and faucets. Electrical: Work for renovation generally includes new breakers, conduit and wiring, new receptacles; new dimmable recessed LED light fixtures and occupancy sensors; new AerDec Sink System to include hard-wired deck mounted hand dryer at each lavatory in addition to battery operated faucet and soap dispenser; new automatic paper towel dispensers.
Posted Date
Jun 27, 2025
Due Date
Jan 7, 2026
Release: Jun 27, 2025
Close: Jan 7, 2026
This project will renovate seven (7) Men's public restrooms, seven (7) Women’s public restrooms and two (2) Companion Care public restrooms located on the first, second and third floors of the terminal building in both sterile and non-sterile areas. All of the work will be done within the existing footprint of each bathroom and will include demolition of existing finishes with the existing terrazzo floor remaining in place and all plumbing fixtures and finishes to be replaced. The work generally includes: General Construction: The general contractor shall be responsible for taking the lead role for the purpose of coordination between disciplines to ensure the work is completed as shown on the plans and specified. Work for renovation generally includes new drywall ceilings; new acoustical ceiling tile and grid; new moisture-resistant wall board behind all new wall tile; remove and replace damaged metal studs; new tile floor shall be sloped to existing drain locations; new toilet partitions and toilet accessories; new AerDec Sink System and structural supports; new internally illuminated panel system at entry; new counter mounted panel system; Interior painting; new door, frame, and hardware; new signage. Mechanical: Work for renovation generally includes new supply and return air diffusers in accordance with new ACT ceiling and drywall ceilings; Test, balance and commission system, new toilets, flushometers, and faucets. Electrical: Work for renovation generally includes new breakers, conduit and wiring, new receptacles; new dimmable recessed LED light fixtures and occupancy sensors; new AerDec Sink System to include hard-wired deck mounted hand dryer at each lavatory in addition to battery operated faucet and soap dispenser; new automatic paper towel dispensers.
AvailableImprovements To High School For The Public Schools.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Improvements To High School For The Public Schools.
AvailableProvide 2026 phase ii capital improvements.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
Provide 2026 phase ii capital improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis