Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Blake avenue phase II 21st to 23rd street.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes traffic control, 2410 SY pavement removal/disposition, 1260 LF remove existing sanitary sewer pipe, 660 LF remove existing storm sewer pipe, 2390 SY 7" p. C. C. Pavement, 2425 SY fly ash stabilization, 1400 LF subdrain longitudinal, 4" dia, 255 LF storm sewer pipe, 15 inch rcp class iii, 595 LF sanitary sewer pipe, 21" pvc main, 80 VF 60" i. D. Circular sanitary sewer manhole (sw-301). See outside link.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Work includes traffic control, 2410 SY pavement removal/disposition, 1260 LF remove existing sanitary sewer pipe, 660 LF remove existing storm sewer pipe, 2390 SY 7" p. C. C. Pavement, 2425 SY fly ash stabilization, 1400 LF subdrain longitudinal, 4" dia, 255 LF storm sewer pipe, 15 inch rcp class iii, 595 LF sanitary sewer pipe, 21" pvc main, 80 VF 60" i. D. Circular sanitary sewer manhole (sw-301). See outside link.
Premium
Access the largest public sector contact database
Construct a pedestrian plaza on Thomas Street between Fifth Avenue North and Taylor Avenue North including new sidewalk, pavement, channelization, signals, drainage, and landscaping. Work also includes rebar installation and electrical.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Construct a pedestrian plaza on Thomas Street between Fifth Avenue North and Taylor Avenue North including new sidewalk, pavement, channelization, signals, drainage, and landscaping. Work also includes rebar installation and electrical.
The work consists of milling, paving, and general road maintenance work, including storm basin repairs.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
The work consists of milling, paving, and general road maintenance work, including storm basin repairs.
Work includes construction of ADA compliant sidewalk, ramps, & street improvements.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work includes construction of ADA compliant sidewalk, ramps, & street improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis