Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of approx 3,669 LF of pipe bursting 8" gravity sewer truss pipe, approx 14 manhole rehabilitations, reconnecting 24 services, and all appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Lakeside County Water and Sewer District (District/Owner) is seeking to obtain General Contractor / Construction Manager (GC/CM) services from a qualified construction firm to participate in a collaborative process with the District and Engineer to undertake pre-construction services and construction services for the Lakeside Wastewater Treatment – SBR Facility and Collection System Capacity Improvements.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 3, 2026
The Lakeside County Water and Sewer District (District/Owner) is seeking to obtain General Contractor / Construction Manager (GC/CM) services from a qualified construction firm to participate in a collaborative process with the District and Engineer to undertake pre-construction services and construction services for the Lakeside Wastewater Treatment – SBR Facility and Collection System Capacity Improvements.
AvailableProject will consist of the construction of three new dual-bed twocell gravity filters equipped with media and leopold type xa underdrain systems. Other contruction will include: new filter effluent, backwash, and rewash pipes installed in the filter building pipe gallery; new air scour piping to support new filters; civil improvements associated with new wash water main serving new filters discharging into existing circular gravity thickener; new asphalt roadway to filters and retacking existing asphalt roadways; improving exterior concrete stairs; relocating hvac condensing unit and refrigerant lines; demolition of supply fans in the high service pump building and ancillary electrical and instrumentation improvements.
Posted Date
Dec 19, 2025
Due Date
Feb 27, 2026
Release: Dec 19, 2025
Close: Feb 27, 2026
Project will consist of the construction of three new dual-bed twocell gravity filters equipped with media and leopold type xa underdrain systems. Other contruction will include: new filter effluent, backwash, and rewash pipes installed in the filter building pipe gallery; new air scour piping to support new filters; civil improvements associated with new wash water main serving new filters discharging into existing circular gravity thickener; new asphalt roadway to filters and retacking existing asphalt roadways; improving exterior concrete stairs; relocating hvac condensing unit and refrigerant lines; demolition of supply fans in the high service pump building and ancillary electrical and instrumentation improvements.
AvailableContractors are expected to construct and erect a Poligon Pavilion and surrounding structures.
Posted Date
Jan 26, 2026
Due Date
Feb 12, 2026
Release: Jan 26, 2026
Close: Feb 12, 2026
Contractors are expected to construct and erect a Poligon Pavilion and surrounding structures.
AvailableProject include 291 LF cure in place pipe (CIPP) liner-6"; 11,533 LF cure in place pipe (CIPP) liner-8"; 36 ea point repair by cure-in-place sectional liner (CIP) 8"; 1 LS temporary sewage bypass; 577 LF cure in place pipe (CIPP) liner-12"; 461 LF in place pipe (CIPP) liner-10". See attached file.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
Project include 291 LF cure in place pipe (CIPP) liner-6"; 11,533 LF cure in place pipe (CIPP) liner-8"; 36 ea point repair by cure-in-place sectional liner (CIP) 8"; 1 LS temporary sewage bypass; 577 LF cure in place pipe (CIPP) liner-12"; 461 LF in place pipe (CIPP) liner-10". See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →