Summary
First floor - renovation of a storage area into a new breakroom and dispatch area with new updated led lighting, two gender neutral restrooms (one which meets ada standards), a new kitchenette, a new dispatch window area, relocated dispatch mailboxes, refinished concrete floors, and window storefronts. Second floor - renovation of common spaces with a new landing facade wall with tv display, updated drinking fountain, repolished concrete floors, updated led lighting, wall cabinetry for added storage, and updated outlets with usb fixtures, new private office, new kitchen layout with proper fixtures, new exhaust fans at all restrooms, new open office with cubicles, new carpet, paint, acoustics at existing offices. Exterior - provide new exterior aluminum storefront system with tempered glass, new aluminum storefront door and door hardware.