Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Clackamas County (through Water Environment Services and the Board of County Commissioners) is soliciting sealed bids to remodel the Kellogg Creek WRRF Administration Building, including roughly 3,600 SF of remodeling and approximately 1,200 SF of new construction on both the east and west ends to improve staff facilities and operations. The project includes major MEP updates, new fixtures and restrooms, conference/break rooms with folding partitions, and is estimated at $3,500,000 with substantial completion within 274 calendar days.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Clackamas County (through Water Environment Services and the Board of County Commissioners) is soliciting sealed bids to remodel the Kellogg Creek WRRF Administration Building, including roughly 3,600 SF of remodeling and approximately 1,200 SF of new construction on both the east and west ends to improve staff facilities and operations. The project includes major MEP updates, new fixtures and restrooms, conference/break rooms with folding partitions, and is estimated at $3,500,000 with substantial completion within 274 calendar days.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Premium
Access the largest public sector contact database
Clackamas County (through Water Environment Services and the Board of County Commissioners) is soliciting sealed bids to remodel the Kellogg Creek WRRF Administration Building, including roughly 3,600 SF of remodeling and approximately 1,200 SF of new construction on both the east and west ends to improve staff facilities and operations. The project includes major MEP updates, new fixtures and restrooms, conference/break rooms with folding partitions, and is estimated at $3,500,000 with substantial completion within 274 calendar days.
Procurement of pre-remodel asbestos and universal waste abatement construction services for the USDC Old Administration Building Remodel.
Posted Date
Dec 9, 2025
Due Date
Dec 29, 2025
Release: Dec 9, 2025
Close: Dec 29, 2025
Procurement of pre-remodel asbestos and universal waste abatement construction services for the USDC Old Administration Building Remodel.
AvailableThe Colorado Department of Public Safety is soliciting bids for a complete remodel of Building 30 at Camp George West, covering HVAC installation, roof and gutter replacement, skylights, insulation, storefront, and restoration/installation of historical windows. The project is estimated at approximately $400,000, requires a 5% bid bond or proposal guaranty, compliance with state prevailing wage and related regulations, and will be managed by a general contractor responsible for subcontractors.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
The Colorado Department of Public Safety is soliciting bids for a complete remodel of Building 30 at Camp George West, covering HVAC installation, roof and gutter replacement, skylights, insulation, storefront, and restoration/installation of historical windows. The project is estimated at approximately $400,000, requires a 5% bid bond or proposal guaranty, compliance with state prevailing wage and related regulations, and will be managed by a general contractor responsible for subcontractors.
AvailableDemolition of existing office and records space on the third floor of the new administration building and the build -out of new offices, conference rooms, and other spaces to support the glwa design, construction, and engineering groups; removal and replacement of an existing air handling unit that serves the third-floor space; associated demolition and new construction for the temporary process control center space on the first floor; and the sequenced demolition and new construction at the existing third and fourth floor main toilet rooms.
Posted Date
Sep 8, 2025
Due Date
Dec 19, 2025
Release: Sep 8, 2025
Close: Dec 19, 2025
Demolition of existing office and records space on the third floor of the new administration building and the build -out of new offices, conference rooms, and other spaces to support the glwa design, construction, and engineering groups; removal and replacement of an existing air handling unit that serves the third-floor space; associated demolition and new construction for the temporary process control center space on the first floor; and the sequenced demolition and new construction at the existing third and fourth floor main toilet rooms.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis