Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work conists of installation of approx, 1,700 LF of new 10" PVC water main; 38 LF of furnish & install 6" PVC water main; 44 ton of gravel resurfacing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Watermain Replacement.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
Watermain Replacement.
AvailablePremium
Access the largest public sector contact database
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
AvailableConstruct approximately 2,697 feet of 8”, 3,993 feet of 6\", and 13 feet of 4\" diameter watermain and new water services, fire hydrants, and mainline valves complete with all necessary appurtenances and surface restoration.
Posted Date
Dec 12, 2025
Due Date
Jan 28, 2026
Release: Dec 12, 2025
Close: Jan 28, 2026
Construct approximately 2,697 feet of 8”, 3,993 feet of 6\", and 13 feet of 4\" diameter watermain and new water services, fire hydrants, and mainline valves complete with all necessary appurtenances and surface restoration.
AvailableConstruction of Worthman Boulevard Watermain Phase III, including boring a 30" x 90' casing pipe, installing 173 feet of 16" water main, and site restoration.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Construction of Worthman Boulevard Watermain Phase III, including boring a 30" x 90' casing pipe, installing 173 feet of 16" water main, and site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis