The Naval Facilities Engineering Systems Command (U.S. Department of Defense) is soliciting bids for the BEQ AS4000 Area Paint - Flooring Repairs project at MCB Camp Lejeune. This is an Invitation for Bid with an estimated cost range of $1,000,000 to $5,000,000 and a contract duration of 720 days; a site visit and pre-bid meeting are scheduled for July 22, 2026 and questions are due July 24, 2026. Key requirements include a bid bond (and payment/performance bonds at award), compliance with the Buy American and Davis-Bacon Acts, and award on the basis of lowest price.
The Naval Facilities Engineering Systems Command (U.S. Department of Defense) is soliciting bids for the BEQ AS4000 Area Paint - Flooring Repairs project at MCB Camp Lejeune. This is an Invitation for Bid with an estimated cost range of $1,000,000 to $5,000,000 and a contract duration of 720 days; a site visit and pre-bid meeting are scheduled for July 22, 2026 and questions are due July 24, 2026. Key requirements include a bid bond (and payment/performance bonds at award), compliance with the Buy American and Davis-Bacon Acts, and award on the basis of lowest price.
This Combined Synopsis/Solicitation (N40085-26-R-9047) requests contractors to provide all labor, materials, equipment, and supervision to perform paint and flooring repairs in buildings HP51, HP53, HP55, and HP57 at Marine Corps Base Camp Lejeune. The work includes surface preparation and painting (interior and exterior), repair of damaged surfaces, mold/mildew cleaning, priming, finish coats, trim/caulking repairs, and replacement of damaged flooring systems, with scheduling and protection of existing items required. The procurement is a Department of the Navy / NAVFAC-managed, Small Business set-aside construction maintenance requirement with place of performance Camp Lejeune, NC and an offer due date of July 29, 2026.
Interior renovations; installation of lightning protection; milling, overlaying, and striping of the parking lot; replacement of sidewalks including demolition, sub-grade preparation, permits, and replacement; unforeseen asbestos containing material (ACM) (piping, pipe insulation, HVAC insulation, etc.); unforeseen asbestos containing material (ACM) (Adhesives, vinyl floor tiles, wall and ceiling insulation, roofing, etc.); unforeseen Lead removal; removal, disposal, and replacement of unsuitable soil (non-contaminated); removal, disposal, and replacement of unforeseen buried utilities (concrete duct banks, piping, cable, etc.); formal partnering; replacement of 10% of the existing roof underlayment and plywood sheathing, and replacement of 5 damaged roof trusses; landscaping including landscape bed surrounding beq with Aluminum edging, landscape weed control fabric, river rock, and ornamental grass to be executed at the end of construction.
This Combined Synopsis/Solicitation (N40085-26-R-9047) requests contractors to provide all labor, materials, equipment, and supervision to perform paint and flooring repairs in buildings HP51, HP53, HP55, and HP57 at Marine Corps Base Camp Lejeune. The work includes surface preparation and painting (interior and exterior), repair of damaged surfaces, mold/mildew cleaning, priming, finish coats, trim/caulking repairs, and replacement of damaged flooring systems, with scheduling and protection of existing items required. The procurement is a Department of the Navy / NAVFAC-managed, Small Business set-aside construction maintenance requirement with place of performance Camp Lejeune, NC and an offer due date of July 29, 2026.
Interior renovations; installation of lightning protection; milling, overlaying, and striping of the parking lot; replacement of sidewalks including demolition, sub-grade preparation, permits, and replacement; unforeseen asbestos containing material (ACM) (piping, pipe insulation, HVAC insulation, etc.); unforeseen asbestos containing material (ACM) (Adhesives, vinyl floor tiles, wall and ceiling insulation, roofing, etc.); unforeseen Lead removal; removal, disposal, and replacement of unsuitable soil (non-contaminated); removal, disposal, and replacement of unforeseen buried utilities (concrete duct banks, piping, cable, etc.); formal partnering; replacement of 10% of the existing roof underlayment and plywood sheathing, and replacement of 5 damaged roof trusses; landscaping including landscape bed surrounding beq with Aluminum edging, landscape weed control fabric, river rock, and ornamental grass to be executed at the end of construction.