Summary
47,700 CY common excavation; 26,600 CY channel and pond excavation; 42,800 tons aggregate base, class 5; 16,750 tons bituminous surfacing; 400 CY haul & dispose of contaminated material; 12,675 lf concrete curb & gutter; 2,375 SY concrete driveway pavement; 32,000 concrete walk; 10,900 lf 12" - 42" storm pipe sewer; 15,000 LF 8" - 12" sanitary pipe sewer main; 150 each televise sanitary sewer service; 140 LF 14" steel casing; 17,800 LF 6" & 8" watermain; 1,025 LF 6" directional boring watermain; 7,900 LF 1" - 4" water service; 1 lump sum new lift station & forcemain; 33. 9 acres seeding; 7,840 LF pavement markings; 1 LS lighting system.