Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally includes the purchase and installation of the following: removal and replacement of existing trees; soil preparation; mulch; construction of concrete landscape border; installation of boulders, shrubs, and ornamental grasses; installation of irrigation system; traffic and sediment control; and other.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Vista is seeking a team composed of a qualified engineering firm and a landscape architectural firm to provide professional services for the design and construction of the E. Vista Way Raised Median Project.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The City of Vista is seeking a team composed of a qualified engineering firm and a landscape architectural firm to provide professional services for the design and construction of the E. Vista Way Raised Median Project.
AvailablePremium
Access the largest public sector contact database
The City of Vista is seeking a team composed of a qualified engineering firm and a landscape architectural firm to provide professional services for the design and construction of the E. Vista Way Raised Median Project.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The City of Vista is seeking a team composed of a qualified engineering firm and a landscape architectural firm to provide professional services for the design and construction of the E. Vista Way Raised Median Project.
AvailableProject provides for the rehabilitation of Midland Avenue between West Seneca Turnpike (NY 173) and West Ostrander Avenue in the City of Syracuse. The project includes milling and paving of the roadway surface with areas of full depth reconstruction; curbing, sidewalk, driveway work; drainage system improvements; replacement of traffic signals; landscaping; and upgrades to signs and pavement markings.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
Project provides for the rehabilitation of Midland Avenue between West Seneca Turnpike (NY 173) and West Ostrander Avenue in the City of Syracuse. The project includes milling and paving of the roadway surface with areas of full depth reconstruction; curbing, sidewalk, driveway work; drainage system improvements; replacement of traffic signals; landscaping; and upgrades to signs and pavement markings.
AvailableWork includes 1 EA project surtax sign, furnish and install; 52.36 AC litter removal, 30 day frequency, 17 total cycles @ 3.08 AC/cycle; 3. 15 AC mowing, 30 day frequency, 17 total cycles @ 1.95 ac/cycle; 1. 19 ac clearing & grubbing; 1 LS landscape complete, large plants-price to include watering during installation & establishment. (see plan sheet 3 for breakdown of items & quantities); 1 LS landscape complete, small plants - price to include watering during installation & establishment (see plan sheet 3 for breakdown of items & quantities); 459 CY organic mulch: 3" depth pine bark nuggets. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Work includes 1 EA project surtax sign, furnish and install; 52.36 AC litter removal, 30 day frequency, 17 total cycles @ 3.08 AC/cycle; 3. 15 AC mowing, 30 day frequency, 17 total cycles @ 1.95 ac/cycle; 1. 19 ac clearing & grubbing; 1 LS landscape complete, large plants-price to include watering during installation & establishment. (see plan sheet 3 for breakdown of items & quantities); 1 LS landscape complete, small plants - price to include watering during installation & establishment (see plan sheet 3 for breakdown of items & quantities); 459 CY organic mulch: 3" depth pine bark nuggets. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis