Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lakewood
Removal and replacement of approx. 35,000 SF of concrete walks. Pedestrian/bike traffic control; 3 ea, tracking control pad; 2 ea, concrete washout; 24,820 SF, demo & dispose 4" conc. Pavement (Truck Haul); 10,330 SF, demo & dispose 4" conc. Pavement (Buggy/Skid Haul); 77 CY, strip & haul 1" depth exist. Subgrade (Truck Haul); 32 CY, strip & haul 1" depth exist. Subgrade (Buggy/Skid Haul); 24,820 SF, concrete pavement, 6" thick (Truck Haul); 10,330 SF, concrete pavement, 6" thick (Buggy/Skid Haul); 6 ea, cast Iron truncated dome embeds, (As Detailed); 34,637 SF, rip & grade disturbed & compacted areas (Haul Roads); 87 CY, import topsoil & backfill edges of new trail; 45,182 SF, native seed & mulch disturbed areas; strip & haul 6" depth exist. Subgrade (Buggy/Skid Haul); import & install 6" depth aggregate base course (CDOT Class 6); straw wattle.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Northern Virginia Community College
Projects are generally described as dredging a lake of approx three (3) acres (5,000 CY) and subsequent removal of surrounding asphalt lake path.
Posted Date
Nov 5, 2025
Due Date
Dec 8, 2025
Release: Nov 5, 2025
Northern Virginia Community College
Close: Dec 8, 2025
Projects are generally described as dredging a lake of approx three (3) acres (5,000 CY) and subsequent removal of surrounding asphalt lake path.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Texas Parks and Wildlife Department
Construction Manager-At-Risk (CMR) Services for park development.
Posted Date
Nov 8, 2025
Due Date
Feb 19, 2026
Release: Nov 8, 2025
Texas Parks and Wildlife Department
Close: Feb 19, 2026
Construction Manager-At-Risk (CMR) Services for park development.
AvailableColumbia Housing Authority
Project includes: installation of a full security camera system - roof removal and replacement with insulation and waterproofing - conversion of an existing office/storage unit into a residential unit.
Posted Date
Nov 10, 2025
Due Date
Dec 1, 2025
Release: Nov 10, 2025
Columbia Housing Authority
Close: Dec 1, 2025
Project includes: installation of a full security camera system - roof removal and replacement with insulation and waterproofing - conversion of an existing office/storage unit into a residential unit.
AvailableIndiana Department of Transportation
Construction of auxiliary lanes, bridge replacement and multi-use path. Work includes clearing right of way; 11,545 CY of common excavation; 80 SY of 1 1/2" asphalt milling; 44 LS of reset guardrail; 141 SY of concrete curb ramp; 73 SY of erosion control blanket; piling; 1 LS surface seal; 267 LF of 10" dia ductile iron pipe; 223 LF of 2" water service line; 1 Ea watermain; 62 LF of 12" ductile iron pipe; 90 LF of force main; signage; pavement markings. See attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Construction of auxiliary lanes, bridge replacement and multi-use path. Work includes clearing right of way; 11,545 CY of common excavation; 80 SY of 1 1/2" asphalt milling; 44 LS of reset guardrail; 141 SY of concrete curb ramp; 73 SY of erosion control blanket; piling; 1 LS surface seal; 267 LF of 10" dia ductile iron pipe; 223 LF of 2" water service line; 1 Ea watermain; 62 LF of 12" ductile iron pipe; 90 LF of force main; signage; pavement markings. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →