Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Northern Virginia Community College
Projects are generally described as dredging a lake of approx three (3) acres (5,000 CY) and subsequent removal of surrounding asphalt lake path.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Shell Rock River Watershed District
Hydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
Posted Date
Nov 24, 2025
Due Date
Jan 16, 2026
Release: Nov 24, 2025
Shell Rock River Watershed District
Close: Jan 16, 2026
Hydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Sonoma
Work consists of asphalt renovation, includes ac improvement to the boat lunch parking area including ac overlay, ac grind, fill & replace, ac full depth plug, restriping, and signage.
Posted Date
Nov 4, 2025
Due Date
Dec 16, 2025
Release: Nov 4, 2025
County of Sonoma
Close: Dec 16, 2025
Work consists of asphalt renovation, includes ac improvement to the boat lunch parking area including ac overlay, ac grind, fill & replace, ac full depth plug, restriping, and signage.
AvailableCity of Lakewood
Removal and replacement of approx. 35,000 SF of concrete walks. Pedestrian/bike traffic control; 3 ea, tracking control pad; 2 ea, concrete washout; 24,820 SF, demo & dispose 4" conc. Pavement (Truck Haul); 10,330 SF, demo & dispose 4" conc. Pavement (Buggy/Skid Haul); 77 CY, strip & haul 1" depth exist. Subgrade (Truck Haul); 32 CY, strip & haul 1" depth exist. Subgrade (Buggy/Skid Haul); 24,820 SF, concrete pavement, 6" thick (Truck Haul); 10,330 SF, concrete pavement, 6" thick (Buggy/Skid Haul); 6 ea, cast Iron truncated dome embeds, (As Detailed); 34,637 SF, rip & grade disturbed & compacted areas (Haul Roads); 87 CY, import topsoil & backfill edges of new trail; 45,182 SF, native seed & mulch disturbed areas; strip & haul 6" depth exist. Subgrade (Buggy/Skid Haul); import & install 6" depth aggregate base course (CDOT Class 6); straw wattle.
Posted Date
Nov 5, 2025
Due Date
Dec 4, 2025
Release: Nov 5, 2025
City of Lakewood
Close: Dec 4, 2025
Removal and replacement of approx. 35,000 SF of concrete walks. Pedestrian/bike traffic control; 3 ea, tracking control pad; 2 ea, concrete washout; 24,820 SF, demo & dispose 4" conc. Pavement (Truck Haul); 10,330 SF, demo & dispose 4" conc. Pavement (Buggy/Skid Haul); 77 CY, strip & haul 1" depth exist. Subgrade (Truck Haul); 32 CY, strip & haul 1" depth exist. Subgrade (Buggy/Skid Haul); 24,820 SF, concrete pavement, 6" thick (Truck Haul); 10,330 SF, concrete pavement, 6" thick (Buggy/Skid Haul); 6 ea, cast Iron truncated dome embeds, (As Detailed); 34,637 SF, rip & grade disturbed & compacted areas (Haul Roads); 87 CY, import topsoil & backfill edges of new trail; 45,182 SF, native seed & mulch disturbed areas; strip & haul 6" depth exist. Subgrade (Buggy/Skid Haul); import & install 6" depth aggregate base course (CDOT Class 6); straw wattle.
AvailableNew York Power Authority
Seeking proposals from qualified firms to design, fabricate, furnish and deliver one new cutterhead dredge for the NYS canal corporation with the option to procure a 2nd cutterhead dredge with the same specifications.
Posted Date
Nov 19, 2025
Due Date
Dec 11, 2025
Release: Nov 19, 2025
New York Power Authority
Close: Dec 11, 2025
Seeking proposals from qualified firms to design, fabricate, furnish and deliver one new cutterhead dredge for the NYS canal corporation with the option to procure a 2nd cutterhead dredge with the same specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →