Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Department of Transportation
Construction of auxiliary lanes, bridge replacement and multi-use path. Work includes clearing right of way; 11,545 CY of common excavation; 80 SY of 1 1/2" asphalt milling; 44 LS of reset guardrail; 141 SY of concrete curb ramp; 73 SY of erosion control blanket; piling; 1 LS surface seal; 267 LF of 10" dia ductile iron pipe; 223 LF of 2" water service line; 1 Ea watermain; 62 LF of 12" ductile iron pipe; 90 LF of force main; signage; pavement markings. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Arizona Department of Transportation
Work consists of removing existing concrete sidewalk and driveways and constructing new concrete multi use path, and driveways. The work also includes installing drainage improvements, sidewalk ramps, metal handrail, scuppers, curb and gutter, signs, pavement markings, utility adjustments and relocations, and other related work.
Posted Date
Oct 6, 2025
Due Date
Dec 19, 2025
Release: Oct 6, 2025
Arizona Department of Transportation
Close: Dec 19, 2025
Work consists of removing existing concrete sidewalk and driveways and constructing new concrete multi use path, and driveways. The work also includes installing drainage improvements, sidewalk ramps, metal handrail, scuppers, curb and gutter, signs, pavement markings, utility adjustments and relocations, and other related work.
AvailableIndiana Department of Transportation
Construction of auxiliary lanes, accel and decel or turn lanes. Work includes clearing right of way; 1,850 CY of common excavation; stormwater management; 95 SY of 1 1/2" asphalt milling; 8,800 LF of joint adhesive; 1,681 LF of video inspection for pipe; 1 Ea type C4 manhole; signage; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Construction of auxiliary lanes, accel and decel or turn lanes. Work includes clearing right of way; 1,850 CY of common excavation; stormwater management; 95 SY of 1 1/2" asphalt milling; 8,800 LF of joint adhesive; 1,681 LF of video inspection for pipe; 1 Ea type C4 manhole; signage; pavement markings. See attached files.
AvailablePasco County
Work includes construction of an eight good wide concrete multi-use path along school road.
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Pasco County
Close: Dec 9, 2025
Work includes construction of an eight good wide concrete multi-use path along school road.
AvailableCity of Wichita
Multi-use path. Removal of existing structures; site clearing (including tree removal); site restoration; 3,350 cy fill, compacted (90% density); 4,000 cy fill, compacted (95% density); 1,700 cy excavation; 16 sy brick pavers removed and reset; 663 sy ac pavement removed; 946 lf concrete c&g removed; 506 lf concrete c&g type 1 (arterial curb) (6" & 1-1/2"); 560 lf concrete c&g type 3 (median curb) (8"); 1,379 sf concrete driveway 8"; 130 sy concrete pavement removed; 3 ea concrete ramp nose section (median); 3,950 sf concrete sidewalk removed; 7,772 sf concrete sidewalk 4"; 144,836 sf concrete sidewalk 5"; 4 ea wheelchair ramp w/ detectable warnings (6'); 4 ea wheelchair ramp w/ detectable warnings (12'). See outside link.
Posted Date
Sep 27, 2025
Due Date
Nov 21, 2025
Release: Sep 27, 2025
City of Wichita
Close: Nov 21, 2025
Multi-use path. Removal of existing structures; site clearing (including tree removal); site restoration; 3,350 cy fill, compacted (90% density); 4,000 cy fill, compacted (95% density); 1,700 cy excavation; 16 sy brick pavers removed and reset; 663 sy ac pavement removed; 946 lf concrete c&g removed; 506 lf concrete c&g type 1 (arterial curb) (6" & 1-1/2"); 560 lf concrete c&g type 3 (median curb) (8"); 1,379 sf concrete driveway 8"; 130 sy concrete pavement removed; 3 ea concrete ramp nose section (median); 3,950 sf concrete sidewalk removed; 7,772 sf concrete sidewalk 4"; 144,836 sf concrete sidewalk 5"; 4 ea wheelchair ramp w/ detectable warnings (6'); 4 ea wheelchair ramp w/ detectable warnings (12'). See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis