Summary
Work includes sub base course to repair a section of the road identified on the attached map. It will consist of repairs at: 5,446 LF; 24' wide drivable surface; 6" of additional road subbase (averaged across the whole road); total of 2,420 CY of subbase; final grade with a 2-4% crown, ensuring a smooth transition to existing road surface, and compact all areas that receive new materials; clear and restore ditches down to a 12" - 24" deep on both sides of the road, as identified on the attached map; ditches should be tapered with a 1:1 slope from the drivable road surface down to 12"-24" deep. The total distance of ditch to be cleared and restored on washington dr is 5,446 LF on each side of the road for a total of 10,892 LF of ditching.