Summary
Work on this contract consists of removal and replacement of the sewage lift station and associated piping at the beach sewage lift station site. 1 LS maintenance of traffic; 1 EA project sign; 1 LS mobilization; 1 LS sewage lift station demolition work; 1 LS site electrical work; 1 LS lift station control panel and SCADA components; 1 LS clearing and grubbing; 54 CY granular borrow; 735 TN replacement backfill; 130 LF silt fence; 61 CY crushed aggregate base course; 61 TN hot mix asphalt pavement; 190 SY turf establishment; 2 EA 4' concrete manhole; 3 VF excess manhole depth over 8'; 13 LF 8" PVC sanitary sewer; 2 EA connect to existing sanitary sewer; 1 LS new lift station; 50 LF 4" ductile iron sewage force main; 9 SF 2" thick rigid insulation.