Summary
This project includes the renovation of the existing historic main building, existing annex building, and a new addition. The GSF breakdown is as follows: main building: 302,683 GSF; annex building: 23,568 GSF; new addition: 22,979 GSF. This final package consists of remaining trades listed below; final cleaning, asphalt, site concrete, fences + gates, retaining walls, landscape masonry restoration, misc. Metals, millwork, traffic coatings, spray insulation, air barriers, metal wall panels, caulking, d/f/h, overhead coiling doors, glass/glazing, plaster, tile, wood flooring, carpet + resilient, wall panels, painting, visual display boards, specialties, flagpoles, signage, operable partitions, kitchen equipment, appliances, athletic equipment, kilns, window treatments, fixed audience seating, stadium seating, site furnishings, swimming pools, greenhouse, elevators, athletic surfacing.