Summary
Temporary erosion control and sign and mailbox relocation and replacement. Sawcutting and removal of concrete curb and gutter, asphalt pavement, and asphalt driveways. Removal and proper disposal or salvage of existing storm sewer and structures with castings, culverts, aggregate, soil, topsoil, and vegetation/trees. Rehabilitation of existing sanitary sewer structures, adjustment of existing sanitary sewer structures and water main valve boxes, and installation of new castings on existing sanitary sewer structures. Construction of new HDPE storm sewer pipe and structures (PVC/reinforced concrete) with castings, concrete sidewalk, ADA-compliant curb ramps, concrete shoulder, concrete curb and gutter, earthwork (grading roadway, swales, and driveways), asphalt paving, permanent signing and pavement marking, and landscape restoration.