Summary
Work includes approx. 7,980 SY of pulverizing, removals, shaping, and compacting necessary to bring street to grade; 530 CY of excavation below subgrade (EBS), if required; 1,590 SY of geotextile subgrade stabilization, if required; 1,060 TON of excavation below subgrade (EBS) backfill, if required; 1,030 LF of concrete curb and gutter replacement; 1,220 TON of 2-1/2" asphaltic concrete binder course; 730 TON of 1-1/2" asphaltic concrete surface course; 210 SF of 6" concrete driveway replacement; 1,670 SF of 3" asphalt driveway replacement, if required; 2,970 SF of concrete sidewalk and curb ramp replacement; 70 SF of detectable warning field; 800 SY of topsoil, turf grass seed, fertilizer and hydromulch.