Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Shawnee Community College
Provide replacement of the existing dugouts and other improvements to the baseball field facilities. Work shall include selective and structure demolition, site and structural concrete, masonry walls, structural steel, wood framing, architectural metal roofing and drainage, hollow metal doors and frames, painting, baseball equipment, baseball backstop netting system, sitework, chain link fence and gates, warning track, and utility and electrical work commensurate to the project scope.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Shawnee Community College
Provide replacement of the existing dugouts and other improvements to the baseball field facilities. Work shall include selective and structure demolition, site and structural concrete, masonry walls, structural steel, wood framing, architectural metal roofing and drainage, hollow metal doors and frames, painting, baseball equipment, baseball backstop netting system, sitework, chain link fence and gates, warning track, and utility and electrical work commensurate to the project scope.
Posted Date
Nov 13, 2025
Due Date
Dec 5, 2025
Release: Nov 13, 2025
Shawnee Community College
Close: Dec 5, 2025
Provide replacement of the existing dugouts and other improvements to the baseball field facilities. Work shall include selective and structure demolition, site and structural concrete, masonry walls, structural steel, wood framing, architectural metal roofing and drainage, hollow metal doors and frames, painting, baseball equipment, baseball backstop netting system, sitework, chain link fence and gates, warning track, and utility and electrical work commensurate to the project scope.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Charter Township of Northville
Removal of (2) existing block dugouts & installation of two (2) 10’ x 20’ T-cantilever shade system dugouts at Community Park field 5 and concrete pads for each dugout (2). The Township hereby solicits bids for the removal of (2) existing block dugouts & installation of two (2) 10’ x 20’ T-cantilever shade system dugouts at Community Park field 5 and concrete pads for each dugout (2).
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
Charter Township of Northville
Close: Dec 9, 2025
Removal of (2) existing block dugouts & installation of two (2) 10’ x 20’ T-cantilever shade system dugouts at Community Park field 5 and concrete pads for each dugout (2). The Township hereby solicits bids for the removal of (2) existing block dugouts & installation of two (2) 10’ x 20’ T-cantilever shade system dugouts at Community Park field 5 and concrete pads for each dugout (2).
AvailableCity of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Posted Date
Sep 26, 2025
Due Date
Dec 5, 2025
Release: Sep 26, 2025
City of Waycross
Close: Dec 5, 2025
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
AvailableStafford County
Work includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
Posted Date
Nov 7, 2025
Due Date
Jan 14, 2026
Release: Nov 7, 2025
Stafford County
Close: Jan 14, 2026
Work includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →